NRCS Conneautville Dam Rehabilitation

You are here: Home / Portfolio Items / NRCS Conneautville Dam Rehabilitation
Conneautville, Pennsylvania

July 3, 2018 by refresh

In 2012, NRCS awarded a prior joint venture team of which Schnabel is a part, an IDIQ contract to provide dam assessments, rehabilitation design, construction services, and design reviews for Conneautville Dam. As dam rehabilitation designer, we are leading this $621,000 task order. To date, we have confirmed some of the findings from the prior reports and found others to be overly conservative. Areas of focus are repair of the auxiliary spillway, treatment of dispersive embankment soils, improvement of the impact basin, and installation of a filter diaphragm. The design is complete and permitting is underway. When completed in 2019, the dam is expected to meet or exceed NRCS and Pennsylvania dam safety criteria, and equal or augment the current level of flood protection.

Services

  • Project Design
  • Geotechnical Investigation
  • SITES Analysis
  • Hydrology and Hydraulics
Ready to start your project?

Footer

Aterra-Schnabel JV

We are a prime contractor with industry-leading capabilities in dam assessment and design, water resources engineering, planning, and construction management services.

610-405-7708

Email

Sitemap

  • Home
  • Who We Are
  • What We Do
  • Contact Us

Copyright © 2023 Schnabel-Aterra. All rights reserved. Return to top